The work is carried out on behalf of the State Commission On Operation And Maintenance Of Tigris River Basin Projects.
The work includes the implementation of the facilities for the ductile pipeline between the fourth and fifth stations, which are represented by (9) vent basins for air valves, (6) vent basins for washing valves, and (5) vent basins for lock valves, and the design and implementation of the water hammer treatment system for the pipeline and the implementation of lifting resistance blocks from