Contract (4600039760) / 2020
The work is carried out on behalf of ENI BV Iraq
It includes the design, preparation and construction of a filtration plant with a capacity of (300,000) barrels / day, in addition to operating and maintaining it for a per
Oil in water | < 5ppm |
Total suspended solids content | ≤ 2 mg /l |
Dissolved Oxygen content | ≤ 50 ppb |
Maximum particle size | ≤ 4µm |
Sulphate (SO4) | max concentration 1000 mg /l |
The station consists of the following parts:
1-The intake basin at the general estuary. 2-A pumping station on the intake basin with a discharge of (3) m3/sec. 3- A station for filtering the water of the general estuary according to the above specifications. 4-Equipping the snail removal system in front of the filtering station. 5- (GRP) pipeline, with a length of (23) km In order to connect with injection stations. 6- A distribution lock station to regulate the distribution of water between the oil fields. 7-Equipping a dredger to maintain the general downstream section near the outlet. 8-Supplying and installing treated water tanks with a capacity of (13,200) m3
|

The cost of implementing the project, with a total amount of (285,500,000) dollars. |