The work is carried out on behalf of the State Commission For Irrigation And Reclamation Projects.

The work includes the reclamation of an area of (10,000) dunums by executing the irrigation network of distributed lined channels and a network of pipes for the feeding channels that irrigates the floods with its facilities of regulators, tubular arches, and the intersections of the channels with roads and drains, in addition to issuing a work change order by creating a covered field sewage network and a pumping station for this network.

The cost of the work is (8,423,473,750) dinars, and the implementation period is (650) days.

 