The work is carried out for the Department of Executing River Dredging Works.

The work includes hammering sheet piles to the sides of Shatt al-Hilla for a kilometer distance from (400 + 6) to (400 + 9) for an amount of (30384000000) dinars and a period of implementation (24) months. Cash

In the year (2020) the designs were modified by using stone cladding to cover the side walkways of the Shatt al-Hilla, in addition to the work of walkways, gardens, and an iron quarry parallel to the banks, with erection of lighting poles along the banks, with the creation of a slide for mechanisms, and the establishment of a chest regulator with the shift schedule, and work began after the completion of the designs on 10/10 /2020.