The work is carried out on behalf of the State Commission On Operation And Maintenance Of Tigris River Basin Projects.
The project aims to feed the irrigation pumping station (9) Nissan, feeding electricity with a voltage of (33KV) from the Al-Obeidi Electricity Distribution Station (132KV), with a total length of about (5) km.
That includes work:
– Construction of an electricity transformer station building
– Supplying, installing and operating an electric transformer (11/33 KV) with a capacity of (16×1 MVA).
– Supplying and laying high-pressure cables (33KV) measuring (1 x 400 mm2) with a length of (1500m).
– Supplying and installing networked electricity poles, height (14m), number (70).
– Supplying and laying aluminum electric wires measuring (35 x 210 mm2) with a length of (13000m) with all power line accessories.
Work started on 7/1/2021