The conveyor line project between the fourth and fifth stations in Al-Dabuni / WasitمشاريعImplement excavations in the Makhoul Dam project:مشاريعShatt Al-Hilla development project within the city of Al-Hilla / Babil GovernorateمشاريعImplementing the open lined channel and crossing the pipes for the Holy Karbala Refinery water intake project / Holy Karbala GovernorateمشاريعDesign, equipment and construction of a water filtration station for injection of oil wells in the Zubair oil field / Basra Governorate.مشاريعEarthworks and stone cladding for embankment A / Basra GovernorateمشاريعCorrosion treatment project at the border control embankment from (10-20) km / Basra GovernorateمشاريعErosion treatment project in the left shoulder of the Diyala River, backside of Hamrin Dam / Diyala GovernorateمشاريعRehabilitate and complete deficiencies for the sixth part of the fifth phase of the Ramadi Land Reclamation Project / Anbar GovernorateمشاريعReclamation of Diwaniyah- Shafia Land / Al-Sunniyyah Sector / Al-Diwaniyah GovernorateمشاريعA project to extend ductile pipes between stations (4 and 5)/ Al-Dabouni- WasitمشاريعReclamation of the Husseiniya lands (the first phase) for an area of (10,000) dunums / Holy Karbala GovernorateمشاريعThe project of establishing an electric line for the irrigation pumping station (9) AprilمشاريعThe Fast Track project to supply water to the Zubair fieldمشاريع